Spearin Preston and Burrows has started the renovation of the Belt Parkway Bridge over the Paerdegat Basin in Brooklyn. They are using the NEW APE/J&M 416 vibro with a gun-drilled top (eliminates hoses) and are pulling wood piles with the exclusive APE woodpile clamp (affectionately nicknamed the "Woodhead"). The 416 is also driving 14 inch "H" piles using a 126B universal clamp.
|