| 
					  Attached some photos I took today here in Abu Dhabi. 
  The contractor APCC is using our brand new J+M416 to drive temporary  steel casings of 750 mm diameter and 18 m length in pre-bored soil at  the prestegious Marina Mall Extension project. About 300 piles have to  be made and I am glad to report that APCC is very happy with our vibro.  
 
  
				 |